EVIONOR
On-Site Analysis - Multiple Chargers
For condominiums, office buildings and underground parking lots, installing multiple electric car charging stations requires careful, forward-looking planning. During the on-site assessment, our experts examine the electrical capacity of the building, the expansion possibilities and the optimal positioning of the charging stations, in order to be able to propose a scalable and safe charging infrastructure in the long term.
We offer dynamic load balancing, individual metering and billing, and a scalable and scalable system design. At the end of the assessment, you will have a clear picture of the number of charging points that can be safely implemented and the estimated investment costs.
Our national network of electricians can carry out the assessment within 5 working days.
The evaluation is non-binding, but if you order the execution of the work from us, its cost will be deducted from the total amount of the installation.
Intelligent control
The intelligent control automatically adapts to the rates and your daily routine, so that you always charge at the lowest price. You can control it from the app, it protects the grid with dynamic load sharing and works together with your solar panels.
What is load management?
By continuously measuring consumption, the EV charger automatically adapts to the available free capacity (dynamic load balancing). This avoids overloading and tripping fuses, the network remains stable, priorities can be set, and available energy is distributed as efficiently as possible.
Who do we recommend?
With load management, in most cases costly network expansion can be avoided or postponed, while operation remains secure, scalable and cost-effective. We recommend for houses, apartment blocks, office buildings, parking lots and fleets, where several chargers or large consumers are running in parallel — especially alongside solar systems.
Graph of daily electricity consumption

